SF5 - Catalyst support Plant debottlenecking
CLIENT: Lyondellbasell – Tecnimont
ENDUSER: Lyondellbasell
LOCATION: Ferrara (Italy)
Description:
SF5 plant produces supports suitable for the production of Ziegler-Natta type catalysts for the polymerization of alpha-olefins. The purpose of the Project is to debottleneck the existing SF5 Plant to achieve 1750 t/y production capability, retaining flexibility for remaining debottleneck steps (2200 t/y and 2500 t/y) as future Projects.
Disciplines involved:
- Project Management
- Process
- Mechanical
- Piping &Layout
- 3D modelling
- Geotechnical
- Civil & Structural
- Architectural & MEP
- Electrical
- Instrumentation & Control
- Fire fighting
Scope of work:
Phase | Duration | MHR’s |
FEL1 – INCICO S.P.A FEL2 – INCICO S.P.A FEL3 – INCICO S.P.A | Dec2019 – Mar2020 Jun2020 – Apr2021 Dec2021 – ongoing | 5,000 10,000 75,000 |
FEL-3 – IIEPL (3D Model, Laser Scan Implementation & Layout activities) | October-2022 to April-2023 | 5,500 |
800MW Combined Cycle Power Plant (Greece)
CLIENT: Edision Group SPA
LOCATION: Thessaloniki (Greece)
Description
Detailed engineering has been done for gas, steam turbine building, ST & GT Machine foundation, HRSG & Electrical building.
Disciplines involved:
Civil & Structural
Duration:
Start: Aug ‘22
End: Till date
Scope of Work:
- Detailed Engineering, 3D model
- 8000 Engineering man hours
- 143 Civil & Structural drawings
- 11 Calculation report
- 3000 ton of steel Structure
JSW New Blast Furnace BF-5 Tower and Casthouse
CLIENT: Paul Wurth – India
ENDUSER: JSW GROUP
LOCATION: Toranagallu (India)
Description:
NEW BF plant is based on BF#3 twin project which was revamped in 2018.
Disciplines involved:
- Piping & Layout
- Civil & Structural
- Stress & Support
- Dedusting Ducting
Duration:
Start: Sep ‘21
End: Till date
Scope of Work:
- Detailed Engineering, 3D model
- 41.000 Engineering man hours
- 3600 Piping lines and 7000 ISOs
- 4000 Support Drawings
- 12000 ton of steel Structures
Produced water treatment & water Injection Facilities
CLIENT: Cannon Artes
ENDUSER: Lukoil
LOCATION: West Qurna 2 (Iraq)
Description
Engineering of the produced water treatment & sludge thickening and dewatering package, treating a total flow rate of 1320 m3/h equal to nearly 200 kbpd.
Disciplines involved:
- Piping & Layout
- Civil & Structural
- Support
- Electrical Cabletrays
Duration
Start: Sep ‘20
End: Nov ‘22
Scope of Work:
- Detailed Engineering, 3D model
- 6000 Engineering man hours
- 450 Piping lines
Power Plant Projects
CLIENT: Thermax limited, Chennai – India.
LOCATION: Gujarat-india, Kajiado county – South Africa, Kharagpur – India, Andhrapradesh – India, Mindanao & isabella – phillipines.
Description
Thermal Power plants with various capacity below 25MW
Disciplines involved:
- Electrical & Instrumentation
- Civil & Structural
Duration
Start: 2011
End: Jan – 2023
Scope of Work: Civil
- Structural Modelling and Design of STG Building
- Design of WTP building and STG Deck Foundations
- Design of Pipe Racks ,Tank Foundationsand Fan Foundations
- Design of RCC Chimney and Detailing
- Dynamic Analysis and Design of Pump Foundations
- 3D Modelling and Extraction of RCC and Steel Drawings
Scope of Work: Electrical
- Electrical Systems/Equipment Specification
- Electrical Load List, Calculations, Single Line Diagrams
- Equipment, Cable Tray , Earthing & Lighting Layouts and Lightning Protection Layouts
- Power & Control Cable Schedule, Relay Setting Charts
- As-Built documentation
HINKLEY Point-c Nuclear Power Project
CLIENT: GE – FRANCE
LOCATION: HINKLEY- England, United Kingdom.
Description
Secondary Steel Structures retrofit design.
Disciplines involved:
- Civil & Structural
Duration
Start: April ‘20
End: July ‘20
Scope of Work:
- Secondary Steel Structural Modelling
- Design located within Turbine Hall building and inside/outside
- Hydrazine Building for Nuclear Steam unit
- Steel Connection design and detailing
- 3D Modeling
EVM ENERGIA Del Valle De Mexico Ii
CLIENT: GE POWER LIMITED – FRANCE.
LOCATION: Axapusco – Mexico.
Description
Extension of The Combined Cycle Power Plant.
Disciplines involved:
- Civil & Structural
Duration
Start: Dec ‘18
End: July ‘20
Scope of Work:
- Structural Modelling & Design of Super Structures and Sub Structures.
- Structural Design For Various Modules (Lifting ,Transportation & Operating cases)
- Conceptual Design & Study
- Fabrication Drawings
- 3D Modelling
FHS / CHS Projects
CLIENT: Thermax limited, Chennai – India.
LOCATION: Gujarat-India, Kajiado county – South Africa, Kharagpur – India, Andhrapradesh – India, Mindanao & Isabella – Phillipines.
Description
Fuel handling system / coal handling system for various power plants.
Disciplines involved:
- Electrical & Instrumentation
- Civil & Structural
- Mechanical
Duration
Start: Dec’18
End: July’20
Scope of Work: Electrical & Mechanical
- Scheme Preparation and Design Basis for Conveyor Systems
- Over all Plant Layout, G.A. And Specifications, DES Specification and Selection
- Equipment design , Selection and Finalization
- Equipment Layouts, Cable Tray Layouts, Earthing Layouts, Lighting and Lightning Protection Layouts
- Power & Control Cable Schedule, Relay Setting Charts
- As-Built Documentation.
Scope of Work: Civil
- Structural Modelling and Design of Conveyor Systems.
- Design of Trestles, Gantries Transfer Towers, Crusher House and Screen House.
- Design of Foundations and Supporting Structures.
- 3D modelling and Extraction of RCC, Steel G.A. & Fabrication Drawings.
Hassyan Clean Coal Power Plant Phase 1 & 2
CLIENT: GE POWER LIMITED – UAE.
LOCATION: Saih Shuaib, Dubai- UAE.
Description
Mega Clean Coal Power Plant .
Disciplines involved:
- Civil & Structural
Duration
Unit-1
Start: May’18
End: May’19
Unit-4
Start: Sep’19
End: June’20
Scope of Work: Civil
- Foundation Design for Boiler & MPH Building
- Design Review of MPH Building Steel Structure
Undisclosed Project Airport Buildings
CLIENT: Undisclosed
LOCATION: Italy.
Description
Multi Disciplinary MEP Design & Detailing works.
Description
Multi Disciplinary MEP Design & Detailing works.
Disciplines involved:
- Electrical & Instrumentation
- Mechanical
- Piping
Duration
Start: Dec’18
End: July’20
Scope of Work:
- HVAC
- Electrical
- F&G
- Plumbing
- Fire Fighting
- 3D Modelling & 2D Extraction
Modular Skid Design For Co Production Plants
CLIENT: HALDOR TOPSOE-ITALY
LOCATION: USA.
Description
Multi Disciplinary MEP Design & Detailing works.
Disciplines involved:
- Electrical & Instrumentation
- Mechanical
- Piping
Duration
Start: Dec’19
End: June’20
Scope of Work:
- Structural
- Piping
- Electrical & Instrumentation
- 3D Modelling & 2D Extraction
Lube Oil Skid For Compressor Package
CLIENT: Protec Lube Oil Systems – itlay / Pdo -Oman
LOCATION: OMAN.
Description
Multi Disciplinary MEP Design & Detailing works.
Disciplines involved:
- Electrical & Instrumentation
- Mechanical
- Piping
Duration
Start: May’19
End: June’20
Scope of Work:
- Structural
- Piping
- Electrical & Instrumentation
- 3D Modelling & 2D Extraction
3x660 MW Ghatampur Thermal Power Project
CLIENT: ALSTOM Projects India Ltd / GE Power India Ltd.
LOCATION: Ghatampur Tehsil, Uttar Pradesh – India
Description
Mega Thermal Power Plant.
Disciplines involved:
- Civil & Structural
Duration
Start: Oct’16
End: June’19
Scope of Work:
- Design of Super Structures , substructures & Structural Modelling
- Architectural Design
- Steel Connection Design and Detailing
- Fabrication Drawings
- 3D Modelling
Solar Power / PV Projects
CLIENT: Building Energy, Italy.
LOCATION: Sun power 1.3 & 4 MW Italy , Alto Solar – 3 MW – Chile, El-Queule 7 MW – Chile
Description
Photovoltaic Plant Design.
Disciplines involved:
- Civil & Structural
- Electrical
- SCADA
Duration
Start: Nov’10
End: Feb’11
Start: Jan’15
End: Mar’15
Start: Jan’18
End: Feb’19
Scope of Work:
- Basic and Detailed Engineering- Electrical Load List, I/O lists, SLDs
- Equipment Layout, Earthing Layout, Stringing Methodology & MTO.
INTEGRATION Of 115 Kv BSP To Existing 115 Kv Networks
CLIENT: Mohammed Al-ojaimi Group, Dammam -Ksa
LOCATION: AL-KHAFJI & JUBAIL – Saudi Arabia.
Description
OHTL/UG Transmission line.
Disciplines involved:
- Electrical & Instrumentation
- Civil & Structural
Duration
Start: Jun’16
End: Dec’18
Scope of Work: Electrical & Instrumentation
- Design of OHTL/UG Transmission line Route Length of 100 kms.
- Design Includes Pole Spotting, Profile of the Transmission Line Routes with Sag
- curves, Route Plan, Hardware Assembly Details and MTO, Termination Arrangement with the Gantry Structures
- Substation Modification Works (Protection, Control & Automation)
- Communication System Works (OPGW Retrofit Works for 500KM
- SCADA Modification & FOC Design
Scope of Work: Civil
- Foundation Design for Steel Monopole, Special Structures.
- Helipad, Access Road and finger Road design.
- Bore Hole Location Preparation for Entire Project.
MOCHOVCE NUCLEAR PLANT UNIT-4
CLIENT: ENEL S.P.A
LOCATION: Mochovce-slovenska Republika.
Description
Piping Supports Design & Detailing works.
Disciplines involved:
- Piping & Layout
- Stress & Support
Duration
Start: Aug ‘11
End: April ‘12
Scope of Work:
- Piping & Support Execution Design 32,000 Engineering Man Hours.
- Piping and PDMS 3D Modelling.
- Stress Analysis.
- Support Design.