PROJECTS

SF5 - Catalyst support Plant debottlenecking

CLIENT: Lyondellbasell – Tecnimont

ENDUSER: Lyondellbasell

LOCATION: Ferrara (Italy)

Description:

SF5 plant produces supports suitable for the production of Ziegler-Natta type catalysts for the polymerization of alpha-olefins. The purpose of the Project is to debottleneck the existing SF5 Plant to achieve 1750 t/y production capability, retaining flexibility for remaining debottleneck steps (2200 t/y and 2500 t/y) as future Projects.

Disciplines involved:                                 

  • Project Management
  • Process
  • Mechanical
  • Piping &Layout
  • 3D modelling
  • Geotechnical
  • Civil & Structural
  • Architectural & MEP
  • Electrical
  • Instrumentation & Control
  • Fire fighting

Scope of work:

Phase

Duration

MHR’s

FEL1 – INCICO S.P.A

FEL2 – INCICO S.P.A

FEL3 – INCICO S.P.A

Dec2019 – Mar2020

Jun2020 – Apr2021

Dec2021 – ongoing

 5,000

10,000

75,000

FEL-3 – IIEPL

(3D Model, Laser Scan Implementation & Layout activities)

October-2022 to April-2023

5,500

800MW Combined Cycle Power Plant (Greece)

CLIENT: Edision Group SPA

LOCATION: Thessaloniki (Greece)

Description

Detailed engineering has been done for gas, steam turbine building, ST & GT Machine foundation, HRSG & Electrical building.  

Disciplines involved:

                 Civil & Structural 

Duration:

                 Start: Aug ‘22

                  End: Till date

Scope of Work:

    • Detailed Engineering, 3D model
    • 8000 Engineering man hours
    • 143 Civil & Structural drawings
    • 11 Calculation report
    • 3000 ton of steel Structure

JSW New Blast Furnace BF-5 Tower and Casthouse

CLIENT: Paul Wurth – India

ENDUSER: JSW GROUP

LOCATION: Toranagallu (India)

Description:

NEW BF plant is based on BF#3 twin project which was revamped in 2018.

Disciplines involved:

  • Piping & Layout
  • Civil & Structural
  • Stress & Support
  • Dedusting Ducting

Duration:

         Start: Sep ‘21

         End: Till date

Scope of Work:

  • Detailed Engineering, 3D model
  • 41.000 Engineering man hours
  • 3600 Piping lines and 7000 ISOs
  • 4000 Support Drawings
  • 12000 ton of steel Structures

Produced water treatment & water Injection Facilities

CLIENT: Cannon Artes

ENDUSER: Lukoil

LOCATION: West Qurna 2 (Iraq)

Description

Engineering of the produced water treatment & sludge thickening and dewatering package, treating a total flow rate of 1320 m3/h equal to nearly 200 kbpd.

Disciplines involved:

  • Piping & Layout
  • Civil & Structural
  • Support
  • Electrical Cabletrays

Duration  

          Start: Sep ‘20

          End: Nov ‘22

Scope of Work:

  • Detailed Engineering, 3D model
  • 6000 Engineering man hours
  • 450 Piping lines

Power Plant Projects

CLIENT:   Thermax limited, Chennai – India.

LOCATION: Gujarat-india, Kajiado county – South Africa, Kharagpur – India,      Andhrapradesh – India,   Mindanao & isabella – phillipines.

Description

Thermal Power plants with various capacity below 25MW

Disciplines involved:

  • Electrical & Instrumentation
  • Civil & Structural

Duration  

Start: 2011

End: Jan – 2023

Scope of Work: Civil 

  • Structural Modelling and Design of STG Building
  • Design of WTP building and STG Deck Foundations
  • Design of Pipe Racks ,Tank Foundationsand Fan Foundations
  • Design of RCC Chimney and Detailing
  • Dynamic Analysis and Design of Pump Foundations
  • 3D Modelling and Extraction of RCC and Steel Drawings

Scope of Work: Electrical 

  • Electrical Systems/Equipment Specification
  • Electrical Load List, Calculations, Single Line Diagrams
  • Equipment, Cable Tray , Earthing & Lighting Layouts and Lightning Protection Layouts
  • Power & Control Cable Schedule, Relay Setting Charts
  • As-Built documentation

HINKLEY Point-c Nuclear Power Project

CLIENT:   GE – FRANCE

LOCATION: HINKLEY- England, United Kingdom.

Description

Secondary Steel Structures retrofit design.

Disciplines involved:

  • Civil & Structural

Duration  

Start: April ‘20

End:  July ‘20

Scope of Work:

  • Secondary Steel Structural Modelling
  • Design located within Turbine Hall building and inside/outside
  • Hydrazine Building for Nuclear Steam unit
  • Steel Connection design and detailing
  • 3D Modeling

EVM ENERGIA Del Valle De Mexico Ii

CLIENT: GE POWER LIMITED – FRANCE.

LOCATION:  Axapusco – Mexico.

Description

Extension of The Combined Cycle Power Plant.

Disciplines involved:

  • Civil & Structural

Duration  

Start: Dec ‘18

End: July ‘20

Scope of Work:

  • Structural Modelling & Design of Super Structures and Sub Structures.
  • Structural Design For Various Modules (Lifting ,Transportation & Operating cases)
  • Conceptual Design & Study
  • Fabrication Drawings
  • 3D Modelling

FHS / CHS Projects

CLIENT:   Thermax limited, Chennai – India.

LOCATION: Gujarat-India, Kajiado county – South Africa, Kharagpur – India,      Andhrapradesh – India,   Mindanao & Isabella – Phillipines.

Description

Fuel handling system / coal handling system for various power plants.

Disciplines involved:

  • Electrical & Instrumentation
  • Civil & Structural
  • Mechanical

Duration  

Start: Dec’18

End: July’20

Scope of Work: Electrical & Mechanical 

  • Scheme Preparation and Design Basis for Conveyor Systems
  • Over all Plant Layout, G.A. And Specifications, DES Specification and Selection
  • Equipment design , Selection and Finalization
  • Equipment Layouts, Cable Tray Layouts, Earthing Layouts, Lighting and Lightning Protection Layouts
  • Power & Control Cable Schedule, Relay Setting Charts
  • As-Built Documentation.

Scope of Work: Civil 

  • Structural Modelling and Design of Conveyor Systems.
  • Design of Trestles, Gantries Transfer Towers, Crusher House and Screen House.
  • Design of Foundations and Supporting Structures.
  • 3D modelling and Extraction of RCC, Steel G.A. & Fabrication Drawings.

Hassyan Clean Coal Power Plant Phase 1 & 2

CLIENT:   GE POWER LIMITED – UAE.

LOCATION: Saih Shuaib, Dubai- UAE.

Description

Mega Clean Coal Power Plant .

Disciplines involved:

  • Civil & Structural

Duration  

Unit-1

Start: May’18

End:  May’19

Unit-4
Start: Sep’19

End:  June’20

Scope of Work: Civil

  • Foundation Design for Boiler & MPH Building
  • Design Review of MPH Building Steel Structure

Undisclosed Project Airport Buildings

CLIENT: Undisclosed

                                                                          

LOCATION: Italy.

 

Description

Multi Disciplinary MEP Design &  Detailing works.

Description

Multi Disciplinary MEP Design &  Detailing works.

Disciplines involved:

  • Electrical & Instrumentation
  • Mechanical
  • Piping

Duration  

Start: Dec’18

End: July’20

Scope of Work:

  • HVAC
  • Electrical
  • F&G
  • Plumbing
  • Fire Fighting
  • 3D Modelling & 2D Extraction

 

Modular Skid Design For Co Production Plants

CLIENT: HALDOR TOPSOE-ITALY

LOCATION: USA.

Description

Multi Disciplinary MEP Design &  Detailing works.

Disciplines involved:

  • Electrical & Instrumentation
  • Mechanical
  • Piping

Duration  

Start: Dec’19

End: June’20

Scope of Work:

  • Structural
  • Piping
  • Electrical & Instrumentation
  • 3D Modelling & 2D Extraction

Lube Oil Skid For Compressor Package

CLIENT: Protec Lube Oil Systems – itlay / Pdo -Oman  

LOCATION: OMAN.

Description

Multi Disciplinary MEP Design &  Detailing works.

Disciplines involved:

  • Electrical & Instrumentation
  • Mechanical
  • Piping

Duration  

Start: May’19

End: June’20

Scope of Work:

  • Structural
  • Piping
  • Electrical & Instrumentation
  • 3D Modelling & 2D Extraction

3x660 MW Ghatampur Thermal Power Project

CLIENT: ALSTOM Projects India Ltd / GE Power India Ltd.

LOCATION: Ghatampur Tehsil, Uttar Pradesh – India

Description

Mega Thermal Power Plant.

Disciplines involved:

  • Civil & Structural

Duration  

Start: Oct’16

End: June’19

Scope of Work:

  • Design of Super Structures , substructures & Structural Modelling
  • Architectural Design
  • Steel Connection Design and Detailing
  • Fabrication Drawings
  • 3D Modelling

Solar Power / PV Projects

CLIENT:   Building Energy, Italy.

LOCATION: Sun power 1.3 & 4 MW Italy , Alto Solar – 3 MW – Chile,     El-Queule 7 MW – Chile

Description

Photovoltaic Plant Design.

Disciplines involved:

  • Civil & Structural
  • Electrical
  • SCADA

Duration  

Start: Nov’10

End: Feb’11

Start: Jan’15

End: Mar’15

Start: Jan’18

End: Feb’19

Scope of Work:

  • Basic and Detailed Engineering- Electrical Load List, I/O lists, SLDs
  • Equipment Layout, Earthing Layout, Stringing Methodology & MTO.

INTEGRATION Of 115 Kv BSP To Existing 115 Kv Networks

CLIENT:   Mohammed Al-ojaimi Group, Dammam -Ksa
LOCATION: AL-KHAFJI & JUBAIL – Saudi Arabia.

Description

OHTL/UG Transmission line.

Disciplines involved:

  • Electrical & Instrumentation
  • Civil & Structural

Duration  

Start: Jun’16

End: Dec’18

Scope of Work: Electrical & Instrumentation

  • Design of OHTL/UG Transmission line Route Length of 100 kms.
  • Design Includes Pole Spotting, Profile of the Transmission Line Routes with Sag
  • curves, Route Plan, Hardware Assembly Details and MTO, Termination Arrangement with the Gantry Structures
  • Substation Modification Works (Protection, Control & Automation)
  • Communication System Works (OPGW Retrofit Works for 500KM
  • SCADA Modification & FOC Design

Scope of Work: Civil 

  • Foundation Design for Steel Monopole, Special Structures.
  • Helipad, Access Road and finger Road design.
  • Bore Hole Location Preparation for Entire Project.

MOCHOVCE NUCLEAR PLANT UNIT-4

CLIENT:   ENEL S.P.A

LOCATION: Mochovce-slovenska Republika.

Description

Piping Supports Design &  Detailing works.

Disciplines involved:

  • Piping & Layout
  • Stress & Support

Duration  

Start: Aug ‘11

End: April ‘12

Scope of Work:

  • Piping & Support Execution Design 32,000 Engineering Man Hours.
  • Piping and PDMS 3D Modelling.
  • Stress Analysis.
  • Support Design.